Environmental Consultancy Dubai

We have provided a range of environmental studies across Dubai, as a registered environmental consultancy firm with Dubai Municipality EPSS. Our services include conducting baseline surveys, marine ecology and terrestrial ecology, as well as preparing Environmental Impact Assessments (EIAs) and Permit Application Packages (PAPs). With over 12 years of experience in environmental consultancy services in Dubai and our core team members having over 20 years of experience, we bring a wealth of knowledge and expertise to every project. Our focus on sustainability and safety has made us a trusted partner for clients seeking environmental consulting services in the region.

DM-ED Registered Environmental Consultant

12+ Years Experience in Dubai

80% Repeat Business Rate

Flagship Projects in Dubai

Our team has completed numerous projects in Dubai, including Environmental Impact Assessments (EIAs) for mixed-use developments and providing air quality monitoring services for industrial facilities. In addition, we offer sustainability consulting services to help clients develop and implement sustainability strategies that align with their business goals.

Dubai-Creek-Harbour

Dubai Creek Harbour Environmental Management

The DCH masterplan contains 10.6 million m2 Gross Floor Area (GFA) of residential, commercial, tourism and hospitality, and public and cultural buildings; alongside associated public realm and utilities and infrastructure land uses. WKC’s initial role on the Project was to conduct site-wide environmental monitoring including air quality, noise, groundwater, marine water and ecology, avifauna and bat surveys.  This was then supplemented into an Environmental Management and Audit programme of the entire project.

Margham-Wells-Flagship-Project

Margam Wells EIAs

This Project is for the expansion of exploration activities in the Margham area within the Emirate of Dubai. The proposed undertaking entailed the preparation of 10 comprehensive Environmental Impact Assessments (EIAs) to evaluate the potential effects of the project on the surrounding environment. This initiative sought to ensure that the project is conducted in a responsible and sustainable manner, minimizing any adverse impact on the ecological integrity of the region.

Ras-Al-Khor-Wildlife-Sanctuary-Flagship-Project

Ras Al Khor Wildlife Sanctuary (RAKWS) Terrestrial Ecology Survey

Our team conducted a Wetland Vulnerability Assessment Report (Stage 2 WVAR) for Dubai Creek Harbour including a seasonal terrestrial ecology survey.

Land-Drilling-Campaign-EIA-Flagship-Project

Land Drilling Campaign EIA
WKC Group successfully completed Environmental Impact Assessment Report (EIAR) for land-based wells located in the eastern portion of Dubai. Our team of consultants, based in the UAE, carried out the EIAR for the land-based wells, compliant with the requirements of Dubai Municipality (DM) and provide appropriate support to our Client to obtain the required Environmental Clearance (EC).

Intertidal-Lagoon-Monitoring-Flagship-Project

Power Plant Intertidal Lagoon Monitoring

The 2,400MW Hassyan clean coal power station is an ultra-supercritical (USC) power plant developed in Saih Shuaib, Dubai, UAE. WKC’s role was to conduct monthly marine environment surveys surrounding the project to ascertain the current condition of the ecosystems and the biodiversity present. The monitoring scope included: marine water quality, marine ecology, benthic infauna, mangrove monitoring, terrestrial ecology and avifauna aspects.

Click here to read more.

Other Major Registrations in Dubai