Environmental Consultancy Oman

WKC has been involved as an environmental consultant in interesting projects in Oman, which included Air Quality, Noise and Vibration as well as Ecology services.

Flagship Projects in Oman

Khulud Gas Development Noise Study

WKC conducted detailed noise modelling analysis of high noise-emitting equipment associated with the Project using SoundPLAN software. Modelled operational plant noise levels were assessed in accordance with Petroleum Development Oman (PDO) and national noise regulations. The aim of this noise study was to estimate noise levels in-plant areas, and to identify high noise emitting equipment that may require the application of noise control incorporated into the final design.


WKC has a proven track-record in a wide range of sectors in the Middle East


Infrastructure


Power & Water


Mining Minerals & Metals


Manufacturing


Oil and Gas


Chemicals